From 12 January 2026, 0.10 µg/L for the sum of twenty PFAS is daily enforcement across the EU. A carbon bed sized for taste and odour is not automatically a PFAS barrier — here is what actually decides compliance.
From 12 January 2026 the recast Drinking Water Directive (EU) 2020/2184 moves PFAS out of monitoring reports and into daily enforcement: 0.10 µg/L for the sum of twenty substances, 0.03 µg/L for the sum of six — PFOS, PFOA, PFNA, PFHxS, PFHpS, PFBS — or 0.5 µg/L for total PFAS, depending on which scheme the member state applies. For utilities this changes the purchase conversation itself: a carbon bed sized for taste and odour is not automatically a PFAS barrier, and the difference is where most budgets are now being caught out.
PFAS molecules are small, polar and weakly held. A bed that removes geosmin at 20 ng/L in three minutes of contact will not retain PFOS the same way. The working numbers are different: empty bed contact time of 10–20 minutes for PFAS duty instead of the 5–10 minutes taste-and-odour allows, and a design that assumes short-chain compounds break through first — because they do.
Long-chain compounds — PFOA, PFOS, PFNA, PFHxS — adsorb strongly and are retained predictably; coconut GAC with high micropore volume handles them well. The difficulty sits at the short end of the list: PFBA, PFBS and PFHxA pass through the bed weeks or months before the long chains move. A single-vessel design that samples only at the outlet sees nothing until the limit is already crossed. That is why the two-vessel cascade with a midpoint sampling port is becoming the default answer, not an option.
Ask for column test data on your water, not an iodine number — iodine says nothing about PFAS. State in the RFQ whether reactivated carbon is acceptable for potable PFAS service in your jurisdiction; where it is not, that is a specification line, not a topic for negotiation after delivery. And budget the end of life from day one: spent PFAS-loaded carbon is regulated waste in most EU states, and the disposal route — high-temperature incineration or licensed reactivation — belongs in the project cost, not in a footnote.
Fifteen technical notes · no email gate
Both work. They cost money in different places. The day-count of contamination above threshold decides which one — if you compute it honestly.
A monolith is an aerodynamic structure. Face area and cell density decide performance — the price-per-tonne conversation never touches either.
Most imported-carbon problems are paperwork problems that surface at the port. The document set, the honest calendar, and the QC that catches issues at the factory.
Iodine number measures micropores below 2 nanometres. It says almost nothing about decolourisation. Here is the number you should ask for instead.
Contaminant, inlet level, flow rate, target limit — four numbers are enough for a first recommendation and a media volume estimate.